19 Southwick

Toronto, Ontario

This project aims to not only replace deteriorated elements but also to improve the overall functionality, safety, and visual appeal of the entrance area.

This comprehensive renovation project involves:

Entrance Stairs Replacement: The existing concrete entrance stairs and landing slab will be completely replaced to ensure structural integrity and enhance safety.

New Handrail Installation: A new handrail for the front entrance stairs will be installed, providing both safety and an updated aesthetic.

Waterproofing Membrane Application: A new waterproofing membrane will be applied to protect the stairs and landing slab from water damage, enhancing the longevity of the structure.

Concrete Sidewalk Replacement: The project includes the installation of a new concrete sidewalk, contributing to the overall enhancement of the entrance area.

Brick Replacement: Bricks above and below the chimney area will be replaced, addressing any damage and ensuring a cohesive appearance in this specific section.

Sealant Renewal: A new sealant will be applied, particularly around the chimney area, to prevent water infiltration and maintain the integrity of the structure.

Handrail Addition at Chimney Area: A new handrail will be added around the chimney area for both safety and aesthetic purposes.