Entrance Stairs Replacement: The existing concrete entrance stairs and landing slab will be completely replaced to ensure structural integrity and enhance safety.
New Handrail Installation: A new handrail for the front entrance stairs will be installed, providing both safety and an updated aesthetic.
Waterproofing Membrane Application: A new waterproofing membrane will be applied to protect the stairs and landing slab from water damage, enhancing the longevity of the structure.
Concrete Sidewalk Replacement: The project includes the installation of a new concrete sidewalk, contributing to the overall enhancement of the entrance area.
Brick Replacement: Bricks above and below the chimney area will be replaced, addressing any damage and ensuring a cohesive appearance in this specific section.
Sealant Renewal: A new sealant will be applied, particularly around the chimney area, to prevent water infiltration and maintain the integrity of the structure.
Handrail Addition at Chimney Area: A new handrail will be added around the chimney area for both safety and aesthetic purposes.